    deadlineplan

    A deterministic greedy scheduler for deadline-bound tasks.

    scheduling
    deadlines
    planning
    Download zip
    Author
    Version
    0.1.0
    License
    Apache-2.0
    Last updated
    2 days ago
    Downloads
    14

    No dependencies

    #deadlineplan

    CI

    youyong5/deadlineplan is a small, reusable MoonBit library for planning deadline-bound tasks. It deliberately models generic work rather than a particular domain: a student timetable and a software delivery plan can use the same API.

    The MoonBit scheduling library is the primary deliverable. The CLI and interactive academic/project page are application examples; no Course, Homework, or Exam type is part of the core API.

    #Start from a clone

    Install the MoonBit toolchain and Node.js 24 or newer, then run these commands from a terminal:

    git clone https://github.com/youyong5/DeadlinePlan.git cd DeadlinePlan moon run examples/library_demo moon run --target js cmd/deadlineplan -- examples/student-plan.v1.json node demo/build.mjs node demo/serve.mjs

    The first command after cloning invokes the public MoonBit schedule(...) API directly and prints draft: [0, 30), review: [50, 70), and Unscheduled: 0. The second uses the CLI to parse the versioned JSON example and schedule it through the same public library. The last two build and serve the browser example at http://127.0.0.1:4173; stop its server with Ctrl+C. Switch to 项目交付 in the page for a non-academic example. See the sections below for the full API, JSON rules, and alternative CLI commands.

    All times are signed 32-bit integer UTC minutes relative to the Unix epoch. Negative values are valid. Every interval is half-open: [start, end). An event ending at minute 60 does not conflict with work beginning at minute 60; a task may finish exactly at its deadline.

    #Public API

    • window(start, end) creates an available time window.
    • fixed_event(id, start, end) creates occupied time.
    • task(id, duration_minutes, deadline, dependencies) creates a task.
    • task_with_earliest_start(id, duration_minutes, deadline, dependencies, earliest_start) creates a task that cannot begin before earliest_start.
    • splittable_task(id, duration_minutes, deadline, dependencies, minimum_block_minutes) creates a task whose total work may span several blocks.
    • splittable_task_with_earliest_start(id, duration_minutes, deadline, dependencies, earliest_start, minimum_block_minutes) also sets its earliest start.
    • completed_task(id, completed_at) records a task's actual completion minute.
    • schedule(availability, fixed_events, tasks) validates the input and returns Result[Schedule, ValidationError].
    • schedule_with_completed(availability, fixed_events, tasks, completed) also accepts an array of completion records. The original schedule(...) is equivalent to passing an empty array.
    • schedule_with_confirmed_blocks(availability, fixed_events, tasks, completed, confirmed_blocks) keeps ScheduledBlock values in place while replanning other tasks and the unconfirmed remainder of splittable tasks.
    • parse_plan_json(source) parses a versioned plan document, checks field shape and then calls schedule_with_confirmed_blocks(...) for input validation. It returns Result[PlanDocument, PlanJsonError].
    • serialize_plan_json(document) validates a document through the same entry and returns Result[String, PlanJsonError]. Array order is preserved.

    #JSON plan format (schema version 1)

    Every numeric time is a signed 32-bit integer UTC minute since 1970-01-01T00:00:00Z; intervals are [start, end). This is a complete example (also present as examples/student-plan.v1.json):

    { "schema_version": 1, "availability": [{ "start": 29875680, "end": 29876220 }], "fixed_events": [ { "id": "morning-lecture", "start": 29875740, "end": 29875830 }, { "id": "afternoon-lecture", "start": 29875980, "end": 29876070 }, { "id": "biology-exam", "start": 29876160, "end": 29876220 } ], "tasks": [ { "id": "topic-announced", "duration_minutes": 1, "deadline": 29875681, "dependencies": [] }, { "id": "calculus-homework", "duration_minutes": 60, "deadline": 29875980, "dependencies": ["topic-announced"], "earliest_start": 29875830 }, { "id": "biology-review", "duration_minutes": 210, "deadline": 29876160, "dependencies": ["topic-announced"], "minimum_block_minutes": 60 }, { "id": "exam-setup", "duration_minutes": 30, "deadline": 29876220, "dependencies": ["biology-review"] } ], "completed": [{ "id": "topic-announced", "completed_at": 29875680 }], "confirmed_blocks": [{ "task_id": "biology-review", "start": 29875680, "end": 29875740 }] }

    All six top-level fields are required. fixed_events, completed, and confirmed_blocks may be empty arrays. Every task needs id, duration_minutes, deadline, and dependencies; earliest_start and minimum_block_minutes may be absent or null. A missing minimum means a continuous task; a positive minimum means splittable work. 0 is an actual minute, never an unset marker. An application can attach display names and locations to IDs outside this scheduling document.

    Version 1 readers accept only schema_version: 1; a missing, mistyped, old, or future version is not guessed or migrated. PlanJsonError distinguishes JsonSyntax(message), MissingField(path), WrongType(path, expected), UnexpectedField(path), UnsupportedSchemaVersion(version), and InvalidPlanInput(path, ValidationError). Paths are JSON Pointers such as /tasks/1/dependencies/0 (the root is ""). Syntax messages come from the MoonBit JSON parser and include its position when available. Scheduler validation remains the single source of truth for dependencies, durations, time windows, completed records, and confirmed blocks. Unknown object fields are rejected, rather than silently dropped during a round trip; keep application-only display data outside this format. Parsed record-array order is preserved on serialization, including task order, which breaks equal-deadline ties. A version 1 writer should preserve this order and must not reinterpret minutes as local time or seconds.

    task(...) leaves Task.earliest_start and Task.minimum_block_minutes as None: the task must occupy one continuous block. The earliest-start constructor sets earliest_start to Some(minute). The splittable constructors set minimum_block_minutes to Some(minutes). Minute 0 is an ordinary UTC minute, not an unset marker. All constructors produce tasks for the same schedule(...) call.

    Schedule.blocks contains placed work blocks; a splittable task can have several blocks with the same task ID. A completed task stays in tasks so its ID and dependencies are known, but it produces no new block, does not appear in Schedule.unscheduled, and reserves no availability. Its actual completed_at constrains successors, even if it lies outside availability or after that task's own deadline. Minute 0 is a real completion time, not an unset marker. A successor starts no earlier than the latest of its explicit earliest start, each completed prerequisite's completed_at, and each newly scheduled prerequisite's last block end.

    Schedule.unscheduled records NoContinuousSlot for a continuous task without a slot, SplitWorkIncomplete(remaining_minutes) for a splittable task that cannot fit in the free time available at its turn, or DependencyNotScheduled(dependency_id) for a blocked successor. A completed prerequisite whose time falls at or after a successor's deadline is scheduled, not missing: the successor receives NoContinuousSlot or SplitWorkIncomplete as appropriate. For a split task without confirmed progress, remaining_minutes is its entire duration. With partial confirmation, it is total duration minus confirmed minutes. Failed attempts commit no new blocks; existing confirmed blocks remain in Schedule.blocks and reserve time, even though that task is in Schedule.unscheduled.

    The replanning entry accepts complete or partial confirmation of splittable tasks. A continuous task still needs exactly one confirmed block of its full duration. Each confirmed split block must meet its minimum length; the confirmed lengths may sum to less than the task duration, but never more. Only the missing minutes are newly scheduled. A partially confirmed task becomes a satisfied prerequisite only when all missing minutes have also been placed. Confirmed blocks are returned first in input order at their original times; newly scheduled blocks follow in decision order. They reserve time but are never moved. Completed tasks still reserve no time, and a task cannot be both completed and confirmed.

    Validation rejects empty or inverted windows, non-positive task durations, duplicate task IDs, unknown dependencies, and dependency cycles, including cycles involving completed tasks. Completion records must reference a task in tasks, with at most one record per task; violations return UnknownCompletedTaskId(id) or DuplicateCompletedTaskId(id). It returns InvalidEarliestStart(task_id, earliest_start, deadline) when an explicit earliest start is at or after the deadline, and InvalidMinimumBlock(task_id, minimum_block_minutes, duration_minutes) when the minimum is non-positive or exceeds total work. An earlier start with too little time to fit a continuous task is valid input and yields NoContinuousSlot; so does a deadline before all available time on a task without an explicit start.

    schedule_with_confirmed_blocks additionally validates every confirmed block's task ID, positive length, containment in the union of availability windows, explicit earliest start, deadline, split minimum, and absence of overlap with fixed events or other confirmed blocks. It rejects wrong continuous block counts, continuous partial durations, and any over-confirmed duration. These cases have dedicated ValidationError variants such as InvalidConfirmedWindow, ConfirmedOutsideAvailability, ConfirmedDurationMismatch, ConfirmedOverlapsFixedEvent, and ConfirmedBlocksOverlap.

    This entry also checks the actual timeline of tasks already completed or with confirmed blocks. Every prerequisite of such a task must itself be completed or fully confirmed; a partially confirmed prerequisite is not finished and produces UnresolvedPriorDependency(task_id, prerequisite_id). A prerequisite finishing after the completed task's actual completion, or after the first confirmed block of a task, returns PriorDependencyFinishesLate(task_id, prerequisite_id, finished_at, actual_time). Equal boundary minutes are allowed. The older schedule(...) and schedule_with_completed(...) keep their previous behavior; this additional timeline check belongs to the replanning entry.

    #Behaviour

    This is an initial deterministic greedy scheduler across tasks. Once all dependencies of a task are scheduled, it chooses the ready task with the earliest deadline (input order breaks equal deadlines). Continuous tasks use the earliest whole slot. For each selected splittable task, the scheduler considers free gaps in time order and takes as much as possible from the current gap while preserving a feasible allocation in later gaps. A task starts no earlier than its explicit earliest start or the completion of any prerequisite, and every block must end by its deadline. Fixed events and already scheduled work occupy time.

    Without confirmed progress, every block of a splittable task, including the final block, must be at least minimum_block_minutes long. Only when some work is already confirmed, at most one final newly placed block may be shorter than that minimum to finish the exact remaining duration. For example, a 60-minute task with a 40-minute minimum and one confirmed 50-minute block may take a final 10-minute block. Other new blocks and all confirmed blocks still meet the minimum. A gap may be shortened or skipped so that later gaps can hold the remainder. The allocation test works on gap lengths, without a per-minute time table. SplitWorkIncomplete(remaining_minutes) is not proof that another task order or reschedule of earlier work could not make room.

    Availability windows may be unordered, overlapping, duplicated, or touching; their union is treated as continuous available time. Task blocks do not overlap fixed events or other task blocks, even if several availability windows cover the same minutes. Without confirmed blocks, Schedule.blocks records scheduling decision order; with confirmed blocks, their input order comes first, so the array need not be chronological. New work for a partially confirmed task may be placed before an existing confirmed block if a legal earlier gap exists; its successor still waits for the latest end among all of that task's blocks. The scheduler never changes the caller's input arrays.

    An unscheduled task does not mean that no feasible schedule for all tasks exists mathematically. A different ordering can produce a better outcome. This library does not parse iCalendar data, implement recurrence rules, or provide general resource reservation; those directions are already covered by Mooncakes projects.

    #Example outcomes

    The examples are public-API tests in tests/scheduling_test.mbt, tests/splittable_test.mbt, tests/completed_test.mbt, tests/confirmed_test.mbt, and tests/partial_confirmed_test.mbt.

    • Student example: homework is assigned at minute 15; math-homework is [15, 60). Two lectures occupy [60, 90) and [120, 150), so splittable biology-exam-review completes before minute 180 in [90, 120) and [150, 180). history-essay remains unscheduled with NoContinuousSlot.
    • Project delivery example: materials arrive at minute 170; draft is [0, 90), review [90, 120), and release-package [170, 230); all tasks are scheduled.
    • Split project handoff example: draft is [0, 30), handoff is [60, 100) and [120, 140) around two fixed events, and dependent delivery-review begins at [140, 150).
    • Student to-do example with a completed prerequisite: assignment-briefing finished at minute 30 without occupying the new plan. A lecture occupies [40, 50), so homework is [50, 70) and quiz-preparation is [70, 80).
    • Project to-do example with completed prerequisites: materials-ready finished at 25 and approval at 72. assembly is [25, 40), split documentation is [40, 50) and [60, 70), and handoff waits for both documentation and approval before occupying [72, 77).
    • Student replan: confirmed homework stays [0, 10) when a new lecture occupies [20, 35). exam-review moves from [10, 25) to [35, 50), and summary moves from [25, 35) to [50, 60).
    • Project replan: confirmed split design stays [0, 10) and [20, 30). A new vendor call occupies [30, 45), so build takes [45, 60); handoff waits for both build and an approval completed at 65, then takes [65, 75).
    • Student partial-progress replan: biology-review keeps confirmed [0, 20) and finishes around two lectures in [40, 60) and [80, 100); dependent exam-setup is [100, 110).
    • Project partial-progress replan: design keeps confirmed [0, 30) and adds [50, 90) after a vendor call. release waits for design and an approval completed at 100, then takes [100, 110).
    • JSON student file: a completed topic-announced record and confirmed 2026-10-21 00:00–01:00 UTC biology-review block leave room for calculus-homework at 02:30–03:30, review at 03:30–05:00 and 06:30–07:30, and exam-setup at 07:30–08:00 UTC. The fixed biology exam follows at 08:00–09:00 UTC.
    • JSON project file: on 2026-10-22 UTC, design keeps 00:00–00:30 and adds 00:50–01:30 around a vendor call; with approval completed at 01:40, release is 01:40–01:50.

    #Command-line demo

    The runnable package is cmd/deadlineplan. It uses the library's public parse_plan_json(...) and schedule_with_confirmed_blocks(...); no JSON schema or scheduling logic is copied into the CLI. It is a JS-target demo using Node's file API and UTC Date formatter, so Node.js must be installed. Run these commands from the project root. The -- passes CLI flags through moon run:

    moon run --target js cmd/deadlineplan -- examples/student-plan.v1.json moon run --target js cmd/deadlineplan -- examples/project-plan.v1.json moon run --target js cmd/deadlineplan -- --json examples/student-plan.v1.json moon run --target js cmd/deadlineplan -- --help

    The student command prints:

    Scheduled blocks (5): confirmed biology-review: [2026-10-21T00:00Z, 2026-10-21T01:00Z) planned calculus-homework: [2026-10-21T02:30Z, 2026-10-21T03:30Z) planned biology-review: [2026-10-21T03:30Z, 2026-10-21T05:00Z) planned biology-review: [2026-10-21T06:30Z, 2026-10-21T07:30Z) planned exam-setup: [2026-10-21T07:30Z, 2026-10-21T08:00Z) Unscheduled tasks (0):

    The project command prints three blocks: confirmed design [2026-10-22T00:00Z, 00:30Z), planned design [00:50Z, 01:30Z), and release [01:40Z, 01:50Z). The --json result has result_version: 1, time_unit: "utc_minutes_since_unix_epoch", chronological blocks with task_id, start, end, and confirmed, plus unscheduled entries whose reason.code and detail fields state the failure. JSON mode writes only one JSON object to stdout. Text mode formats ordinary minutes as UTC dates; minutes outside its safe date formatter are shown as raw minute N. No local time zone is inferred.

    --help and successful planning exit 0, including plans with unscheduled tasks; their reasons remain visible in either output mode. File-read, JSON, or input-validation failures exit 1; invalid or unknown command-line arguments exit 2. Errors and usage failures go to stderr, leaving stdout empty. The machine-readable result format is separate from the input schema and is versioned independently.

    #Local interactive demo

    The single-page demo uses the same version 1 JSON example files. From the repository root, with MoonBit and Node.js installed:

    node demo/build.mjs node demo/serve.mjs

    Open http://127.0.0.1:4173 in a browser. The build command runs moon build --target js demo/bridge, then copies its JS module, the page, and both JSON examples into demo/dist/; the server serves only that local directory. Stop it with Ctrl+C. Re-run the build after changing MoonBit or page source. No account, cloud service, publication, or iCalendar parser is involved.

    The initial academic view shows two classes with room labels, a fixed exam, assignments/review, their deadlines, and the five scheduled work blocks (one confirmed). Select 项目交付 to show the 2026-10-22 vendor meeting, design, completed approval, and release using the same widgets and core call. Edit a task's work minutes or deadline, or add/remove a temporary fixed event: every change sends the current plan JSON to MoonBit and updates the timeline and unscheduled reasons immediately. A new event that overlaps a confirmed block gives ConfirmedOverlapsFixedEvent instead of moving that block; on invalid input, the error banner is current and the timeline is explicitly the last valid schedule. Valid inputs with unscheduled work show NoContinuousSlot, SplitWorkIncomplete, or DependencyNotScheduled as returned by the library. Refreshing or switching scenarios resets local edits.

    Display labels, event categories, classrooms, and meeting places live only in demo/web/app.js, keyed by task/event ID. demo/bridge/bridge.mbt calls the public parse_plan_json(...) and schedule_with_confirmed_blocks(...); JavaScript handles editing, local-time display, and rendering only. The plan format still stores Unix UTC integer minutes; the browser converts them to its local timezone when displaying or accepting datetime-local values. The browser screenshot shows the initial academic view in Asia/Shanghai time.

    To repeat the actual browser checks and refresh the screenshot on Windows with Chrome installed (set CHROME_BIN if Chrome is elsewhere):

    node demo/build.mjs node tests/demo-browser-smoke.mjs

    That check starts and stops its own local server and headless browser, then verifies both scenes, an edited task, a valid temporary event, a conflicting event, unchanged confirmed blocks, and a browser-captured screenshot.

    #Development

    moon fmt moon check --deny-warn moon test moon test --target js # also reads and schedules both JSON example files from disk node demo/build.mjs node tests/demo-browser-smoke.mjs powershell -NoProfile -ExecutionPolicy Bypass -File tests/cli-smoke.ps1

    GitHub Actions runs these checks in a clean Ubuntu environment, installs MoonBit and Node.js, builds the JS bridge, and verifies the CLI and both browser scenarios in headless Chrome. CI pins MoonBit compiler/core 0.10.15+943464bfa (moon 0.1.20261012), the toolchain that generated the checked-in .mbti interfaces; MoonBit's interface text changed under later toolchains. The browser test can use CHROME_BIN to select Chrome and DEADLINEPLAN_SCREENSHOT=0 to avoid rewriting the checked-in screenshot.

    #Packaging and release scope

    moon.mod declares the youyong5/deadlineplan module at version 0.1.0, Apache-2.0, this README, and the repository URL. The root package is the reusable library. moon package --list inspects the prospective Mooncakes archive without publishing it: .moonignore keeps local tooling, tests, the CLI, and the browser demo out of that archive, while retaining the library and runnable example inputs. The GitHub repository contains the full source and demos. No moon publish step is part of CI.

    PlanJsonError

    pub(all) suberror PlanJsonError {
    JsonSyntax(String)
    MissingField(String)
    WrongType(String, String)
    UnexpectedField(String)
    UnsupportedSchemaVersion(Int)
    InvalidPlanInput(String, ValidationError)
    }

    JSON syntax, shape, version, and scheduler validation are separate failures. Field paths use JSON Pointer notation; the root is the empty string.

    CompletedTask

    pub(all) struct CompletedTask {
    id : String
    completed_at : Int
    }

    A task already finished outside this scheduling run.

    FixedEvent

    pub(all) struct FixedEvent {
    id : String
    window : TimeWindow
    }

    A period that cannot be used for task work.

    PlanDocument

    pub(all) struct PlanDocument {
    schema_version : Int
    availability : Array[TimeWindow]
    fixed_events : Array[FixedEvent]
    tasks : Array[Task]
    completed : Array[CompletedTask]
    confirmed_blocks : Array[ScheduledBlock]
    }

    Version 1 plan input. Times are signed Int32 UTC minutes since 1970-01-01T00:00:00Z.

    Schedule

    pub(all) struct Schedule {
    blocks : Array[ScheduledBlock]
    unscheduled : Array[UnscheduledTask]
    }

    The output of a successful scheduling run.

    ScheduledBlock

    pub(all) struct ScheduledBlock {
    task_id : String
    window : TimeWindow
    }

    A continuous interval reserved for a task by the scheduler.

    Task

    pub(all) struct Task {
    id : String
    duration_minutes : Int
    deadline : Int
    dependencies : Array[String]
    earliest_start : Int?
    minimum_block_minutes : Int?
    }

    A unit of work to be scheduled after its dependencies have finished.

    TimeWindow

    pub(all) struct TimeWindow {
    start : Int
    end : Int
    }

    A half-open UTC-minute interval: [start, end).

    UnscheduledReason

    pub(all) enum UnscheduledReason {
    NoContinuousSlot
    SplitWorkIncomplete(Int)
    DependencyNotScheduled(String)
    }

    Why a task could not be put on the greedy schedule.

    UnscheduledTask

    pub(all) struct UnscheduledTask {
    task_id : String
    reason : UnscheduledReason
    }

    A task that was not scheduled, with the reason recorded explicitly.

    ValidationError

    pub(all) enum ValidationError {
    InvalidWindow(String, String, Int, Int)
    InvalidTaskDuration(String, Int)
    InvalidEarliestStart(String, Int, Int)
    InvalidMinimumBlock(String, Int, Int)
    DuplicateTaskId(String)
    UnknownDependency(String, String)
    DependencyCycle
    UnknownCompletedTaskId(String)
    DuplicateCompletedTaskId(String)
    UnknownConfirmedTaskId(String)
    CompletedAndConfirmedTaskId(String)
    InvalidConfirmedWindow(String, Int, Int)
    ConfirmedOutsideAvailability(String, Int, Int)
    ConfirmedBeforeEarliestStart(String, Int, Int)
    ConfirmedAfterDeadline(String, Int, Int)
    ConfirmedBlockTooShort(String, Int64, Int)
    InvalidConfirmedBlockCount(String, Int)
    ConfirmedDurationMismatch(String, Int64, Int)
    ConfirmedOverlapsFixedEvent(String, String)
    ConfirmedBlocksOverlap(String, String)
    UnresolvedPriorDependency(String, String)
    PriorDependencyFinishesLate(String, String, Int, Int)
    }

    Input errors detected before scheduling starts.

    completed_task

    fn completed_task(id : String, completed_at : Int) -> CompletedTask

    Record the actual completion minute of a task in the task list. Validation happens in schedule_with_completed.

    fixed_event

    fn fixed_event(id : String, start : Int, end : Int) -> FixedEvent

    Construct a fixed event. Validation happens in schedule.

    parse_plan_json

    fn parse_plan_json(source : String) -> Result[PlanDocument, PlanJsonError]

    Parse version 1 JSON and validate it with the existing replanning entry. The Result shape is a stable public API; callers inspect parse failures as data.

    schedule

    fn schedule(availability : Array[TimeWindow], fixed_events : Array[FixedEvent], tasks : Array[Task]) -> Result[Schedule, ValidationError]

    Schedule tasks greedily by deadline once their dependencies are complete.

    Ties are resolved by the input order. Each selected task is placed in the earliest feasible time blocks. A returned Ok may still contain unscheduled tasks; input validation failures are returned as Err.

    schedule_with_completed

    fn schedule_with_completed(availability : Array[TimeWindow], fixed_events : Array[FixedEvent], tasks : Array[Task], completed : Array[CompletedTask]) -> Result[Schedule, ValidationError]

    Like schedule, but pre-completed tasks are not scheduled again. Their actual completion minutes still constrain their dependents.

    schedule_with_confirmed_blocks

    fn schedule_with_confirmed_blocks(availability : Array[TimeWindow], fixed_events : Array[FixedEvent], tasks : Array[Task], completed : Array[CompletedTask], confirmed_blocks : Array[ScheduledBlock]) -> Result[Schedule, ValidationError]

    Replan remaining work while retaining confirmed task blocks. Completed tasks have actual completion minutes and reserve no work time.

    serialize_plan_json

    fn serialize_plan_json(document : PlanDocument) -> Result[String, PlanJsonError]

    Emit a canonical version 1 JSON document after scheduler validation. The Result shape is kept for compatibility with existing callers.

    splittable_task

    fn splittable_task(id : String, duration_minutes : Int, deadline : Int, dependencies : Array[String], minimum_block_minutes : Int) -> Task

    Construct a task whose work may be split into blocks of at least minimum_block_minutes. Validation happens in schedule.

    splittable_task_with_earliest_start

    fn splittable_task_with_earliest_start(id : String, duration_minutes : Int, deadline : Int, dependencies : Array[String], earliest_start : Int, minimum_block_minutes : Int) -> Task

    Construct a splittable task that cannot start before earliest_start. Validation happens in schedule.

    task

    fn task(id : String, duration_minutes : Int, deadline : Int, dependencies : Array[String]) -> Task

    Construct a task. Validation happens in schedule.

    task_with_earliest_start

    fn task_with_earliest_start(id : String, duration_minutes : Int, deadline : Int, dependencies : Array[String], earliest_start : Int) -> Task

    Construct a task that cannot begin before earliest_start. Validation happens in schedule.

    window

    fn window(start : Int, end : Int) -> TimeWindow

    Construct a time window. Validation happens in schedule.